Home > Missions > Civil Works > Navigation > NTN2014

2014 Notice To Navigation Interests

 

 NTN 14-01 REVISION TO NOTICE TO NAVIGATION INTEREST 13-48  MOORING CELL CONSTRUCTION  KANAWHA RIVER, MILE 39.0
 NTN 14-02 WINTER NAVIGATION ON THE OHIO RIVER AND TRIBUTARIES
 NTN 14-03 REVIEW OF REGULATIONS AND GENERAL SAFETY PRACTICES
 NTN 14-04 NOTIFICATION OF SINKING OR SUNKEN VESSELS, VESSEL GROUNDINGS, AND BARGE BREAKAWAYS HUNTINGTON DISTRICT OHIO RIVER AND TRIBUTARIES
 NTN 14-05 MAIL DELIVERY AND CREW CHANGE POLICIES FOR THE HUNTINGTON DISTRICT AT NAVIGATION LOCKS FOR TOWBOAT PERSONNEL
 NTN 14-06 RESTRICTED AREAS AT NAVIGATION STRUCTURES IN THE HUNTINGTON DISTRICT

 NTN 14-07

TENTATIVE MAINTENANCE SCHEDULE FOR 2014 HUNTINGTON DISTRICT
 NTN 14-08 STREAM BANK PROTECTION ELK RIVER, MILE 0.8
 NTN 14-09 REVISION TO NOTICE TO NAVIGATION INTERESTS 14-07  REVISED MAINTENANCE SCHEDULE FOR 2014
 NTN 14-10 CHANNEL MAINTENANCE DREDGING HUNTINGTON DISTRICT OHIO AND KANAWHA RIVERS
 NTN 14-11 BOAT DOCK INSTALLATION KANAWHA RIVER, MILE 52.6
 NTN 14-12 BANK STABILIZATION AND BOAT DOCK REPAIR KANAWHA RIVER, MILE 47.1
 NTN 14-13 BANK STABILIZATION KANAWHA RIVER, MILE 27.3 
 NTN 14-14

REVISION TO NOTICE TO NAVIGATION INTEREST 14-12

BANK STABILIZATION AND BOAT DOCK REPAIR  KANAWHA RIVER, MILE 47.1

 NTN 14-15 HUNTINGTON DISTRICT  OHIO RIVER NAVIGATION CHARTS 
 NTN 14-16 CHANNEL MAINTENANCE DREDGING   BIG SANDY RIVER, MILES 0.0 TO 9.0

 

 NTN 14-17 TEMPORARY MOORING SITE   OHIO RIVER, MILE 431.9    
 NTN 14-18 COMMERCIAL DOCK MAINTENANCE  KANAWHA RIVER, MILE 68.3

 

 

 NTN 14-19 BOAT DOCK INSTALLATION  KANAWHA RIVER, MILE 68.3
 NTN 14-20 BANK STABILIZATION / BOAT DOCK INSTALLATION  KANAWHA RIVER, MILE 62.3
 NTN 14-21 CONTAMINATED SEDIMENT CAPPING  OHIO RIVER, MILE 324.5

 

 NTN 14-22

MOORING CELL CONSTRUCTION  OHIO RIVER, MILE 316.4

 NTN 14-23 MOORING CELL CONSTRUCTION BIG SANDY RIVER, MILE 3.5
 NTN 14-24 FACILITY MAINTENANCE DREDGING OHIO RIVER, MILE 127.2
 NTN 14-25

REVISION TO NOTICE TO NAVIGATION INTERESTS 14-09

REVISED MAINTENANCE SCHEDULE FOR 2014 HUNTINGTON DISTRICT

 NTN 14-26 DIVING OPERATIONS FOR MUSSEL SURVEYS OHIO AND KANAWHA RIVERS   HUNTINGTON DISTRICT
 NTN 14-27

REVISION TO NOTICE TO NAVIGATION INTERESTS 14-26 DIVING OPERATIONS FOR MUSSEL SURVEYS

OHIO AND KANAWHA RIVERS HUNTINGTON DISTRICT

 NTN 14-28 MIDDLE WALL REPAIRS GREENUP LOCKS AND DAM  OHIO RIVER, MILE 341.0
 NTN 14-29 MOORING CELL CONSTRUCTION OHIO RIVER, MILE 175.0
 NTN 14-30 REVISION TO NOTICE TO NAVIGATION 14-21 CONTAMINATED SEDIMENT CAPPING OHIO RIVER, MILE 324.5
NTN 14-31  FACILITY MAINTENANCE DREDGING BIG SANDY RIVER, MILE 7.7
NTN 14-32 FACILITY MAINTENANCE DREDGING OHIO RIVER, MILE 404.5
NTN 14-33 CHANNEL MAINTENANCE DREDGING TENTATIVE SCHEDULE HUNTINGTON DISTRICT OHIO RIVER
NTN 14-34 REVISION TO NOTICE TO NAVIGATION 14-30 CONTAMINATED SEDIMENT CAPPING OHIO RIVER, MILE 324.5
NTN 14-35 CORE BORING OHIO RIVER, MILE 315.0
NTN 14-36 REVISION TO NOTICE TO NAVIGATION INTERESTS 14-25  REVISED MAINTENANCE SCHEDULE FOR 2014  HUNTINGTON DISTRICT
NTN 14-37

REVISION TO NOTICE TO NAVIGATION INTERESTS 14-28  MIDDLE WALL REPAIRS 

GREENUP LOCKS AND DAM  OHIO RIVER, MILE 341.0

NTN 14-38 TEMPORARY TOW HAULAGE UNIT REMOVAL LONDON LOCKS AND DAM  KANAWHA RIVER, MILE 82.8
NTN 14-39 REVISION TO NOTICE TO NAVIGATION INTERESTS 14-35 CORE BORING OHIO RIVER, MILE 315.0
NTN 14-40 OUTFALL DIFFUSER INSTALLATION  KANAWHA RIVER, MILE 47.6
NTN 14-41 REVISION TO NOTICE TO NAVIGATION INTERESTS 14-39 CORE BORING
NTN 14-42 HYDRAULIC LINE REPAIRS BELLEVILLE LOCKS AND DAM  OHIO RIVER, MILE 203.9
NTN 14-43 REVISION TO NOTICE TO NAVIGATION INTERESTS 14-41  CORE BORING   OHIO RIVER, MILE 315.0
NTN 14-44 BANK STABILIZATION ELK RIVER, MILE 0.5