Disclaimer

The below listed documents may not be readable via Optical Character Recognition. To receive public notices via email for the Huntington District Regulatory Division please send an email to LRH.Permits@usace.army.mil indicating that you would like to be placed on the public notice electronic distribution list. Your email should include which state(s) Ohio and/or West Virginia in which you would like to receive public notices.

Results:
Archive: August, 2012
Clear
  • LRH-2012-354-GUY

    Expiration date: 9/13/2012

    The applicant has requested authorization to discharge fill material in waters of the U.S. in conjunction with the construction of the West Virginia (WV) State Route 10 (Route 10)relocation project.

  • LRH-2011-00644-SCR

    Expiration date: 9/1/2012

    The applicant proposes to construct the PIC-East West Connector by using a combination of existing roadways and roadways on new alignment in northern Pickaway County, Ohio. In total, the proposed PIC-East West Connector would extend SR 762 approximately 3.75 miles and would require the widening of Duvall Road, Ashville Pike, and Bulen-Pierce Road. Existing Duvall Road would end in cul-de-sacs on both sides of the railroad. The project purpose is to improve levels of service and enhance safety on the local and regional transportation network.

  • LRH-2010-699-ERI

    Expiration date: 9/1/2012

    The project purpose is to preserve SR 531 by reducing and eliminating the impacts of erosion and restoring the structural integrity of the roadway and embankment.

  • LRH-2007-886-BSR

    Expiration date: 8/31/2012

    The proposed project would be located along the left descending bank of the Big Sandy River, from river mile 7.18 to 7.34, approximately 1.1 mile northeast of the community of Lockwood, in Boyd County, Kentucky. The applicant is requesting authorization to perform routine maintenance dredging on an as-needed basis for a period of ten years under a Standard Permit.