LRH-2011-44-GUY - 5/16/2013: The applicant proposes to construct and operate a coal preparation plant (Maben Preparation Plant), refuse disposal area and railroad load-out facility which would result in the discharge of fill material into waters of the United States (U.S.).
Expiration date: 6/16/2013
LRH-2011-531-OHR - 5/16/2013: The applicant proposes to discharge fill material into waters of the United States (U.S) in association with the expansion of the existing Gravel Hill Landfill. The landfill is used for the disposal of coal combustion byproduct waste (residual waste) generated at the applicant’s Gavin Power Plant, a coal-fired electric generating station.
Expiration date: 6/16/2013
LRH-2009-264-OHR - 5/10/2013: The applicant proposes to conduct work within navigable waters of the United States (U.S.) and to discharge fill material into waters of the U.S. in association with the construction of an industrial development referred to as the SunCoke Energy South Shore Facility
Expiration date: 6/10/2013
LRH-2009-161-BCR - 5/9/2013: Coal River Mining, LLC proposes to construct a slurry impoundment (Preparation Plant Utility Area No. 1) which would result in the discharge of fill material into waters of the United States (U.S.) associated with the disposal of coarse and fine coal refuse material generated from processing coal at a nearby plant (Fork Creek Preparation Plant).
Expiration date: 6/7/2013
LRH-2012-373 - 5/6/2013: The North Coast Regional Council of Park Districts has submitted a prospectus pursuant to 33 CPR 332, Compensatory Mitigation for Losses of Aquatic Resources; Final Rule (Final Rule) published April 10, 2008, proposing the establishment of an In Lieu Fee Program (ILFP) to provide mitigation for impacts to waters ofthe United States (U.S.) under Section 404 of the Clean Water Act (Section 404) and Section and 10 ofthe Rivers and Harbors Act (Section 10) within forty four (44) hydrologic unit code (HUC) watersheds within the State of Ohio.
Expiration date: 6/6/2013
|