  • LRH-408-2020-0002

    West Virginia American Water Raw Water Line

  • LRH-408-2021-0007

    408-LRH-2021-0007 – Fiberoptic Crossing under Ashland, Kentucky Floodwall 408-LRH-2021-0010 – Fiberoptic Crossing under Huntington, West Virginia Floodwall 408-LRH-2021-0011 – Fiberoptic Crossing under Ceredo, West Virginia Floodwall

  • LRH-408-2020-0003

    Franklinton Loop – Souder Avenue Multi-Use Path Connector

  • LRH-408-2020-0009

    Columbus Fibernet – Fishel Project

  • LRH-408-2020-0005

    Columbia Line H-8 Replacement

  • LRH-408-2020-0007

    Verizon - Rich Street Stop-Log Closure

  • LRH-408-2020-0004

    Limestone Creek Pump Station Improvements Project

  • LRH-408-2019-0003

    Newark, Ohio 2nd Street Interceptor and Gate Closure Project Drilling Program Plan

  • LRH-408-2022-0014

    Newark, Ohio 2nd Street Interceptor and Gate Closure Project Drilling Program Plan

  • LRH-408-2021-0002

    Portsmouth Water Treatment Plant

  • LRH-408-2022-0023

    Batham Storm Sewer and Orchard Sanitary Sewer Lift Station in Ironton, Ohio

  • LRH-408-2023-0014

    Levee Walkway Ramp in Chillicothe, OH

  • LRH-408-2023-0012

    Sanitary Force Main along Hocking River in Athens, OH

  • LRH-408-2023-0003

    Newark, Ohio 2nd Street Interceptor Project

  • LRH-408-2023-0006

    Drilling and Invasive Program Plan (DIPP) for Waterfront Improvement Project, City of Portsmouth, Scioto County, Ohio

  • LRH 2022-55

    Expiration date: 10/19/2021

    STATE - West Virginia **** PURPOSEThe proposed project, referred to as the Nucor Steel West Virginia (Nucor) Apple Grove Site, would be located within an approximate 691-acre (ac) site located along 7,500 linear feet (lf) of the left descending bank (LDB) of the Ohio River, between river mile points 281 and 282, near Apple Grove, in Mason County, West Virginia (latitude 38.647729°, longitude -82.175875°).  
  • LRH-2020-632

    Expiration date: 1/3/2024

    STATE - OHIO **** APPLICANT - Ohio Department of Natural Resources (ODNR) **** PURPOSE - The applicant has requested a DA authorization to discharge dredged and/or fill material into waters of the United States in conjunction with the proposed McConnelsville Dam Replacement Project.

  • LRH-2023-905

    Expiration date: 1/30/2024

    STATE - OHIO **** SPONSOR - Water and Land Solutions **** PURPOSE - The sponsor has submitted a proposal to develop the Four Mile Mitigation Bank to provide stream mitigation credits that may be used as compensatory mitigation for unavoidable losses to waters authorized under separate permit actions.

  • LRH-2022-165

    Expiration date: 1/3/2024

    STATE - OHIO **** APPLICANT - The Ohio Department of Transportation (ODOT) **** PURPOSE - The overall project would construct approximately 6.1 miles of a new two-lane, and a short four-lane section, of roadway, on a new alignment along with necessary bridges and ancillary features.

  • LRH-2022-932

    Expiration date: 11/28/2023

    STATE - West Virginia **** PURPOSE - In accordance with Title 33 CFR 325.5(c)(1) as published on November 13, 1986, in the Federal Register, Volume 51, Number 219, the district engineers of the Huntington District and Pittsburgh District United States (U.S.) Army Corps of Engineers (Corps), has re-issued the Regional General Permit (RGP) for Abandoned Mine Lands (AML) pursuant to Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act.

  • LRH-2012-147

    Expiration date: 12/8/2022

    STATE - West Virginia **** PURPOSE - PROPOSED REGIONAL GENERAL PERMIT FOR STREAM RESTORATION ACTIVITIES TO BE PERFORMED BY THE WEST VIRGINIA CONSERVATION AGENCY WITHIN THE HUNTINGTON AND PITTSBURGH DISTRICTS FOR THE STATE OF WEST VIRGINIA

  • LRH-2022-820

    Expiration date: 10/15/2023

    STATE - OHIO **** APPLICANT - Brooks Creek Development, LLC**** PURPOSE - The applicant has requested a DA authorization to permanently discharge dredged and/or fill material into two (2) wetlands and one (1) stream (East Fork Mill Creek) in association with the construction of the proposed North Pointe/Brooks Creek Development. Schooley Hollow Mining Area.

  • LRH-2021-942

    Expiration date: 11/13/2022

    STATE - OHIO **** APPLICANT -Hondros Family of Companies **** PURPOSE - The sponsor has submitted a proposal to develop the Woodtown Mitigation Bank to provide stream mitigation credits that may be used as compensatory mitigation for unavoidable losses to waters authorized under separate permit actions in accordance with 33 Code of Federal Regulations (CFR) §325, Ohio Revised Code (ORC) §6111, and Ohio Administrative Code (OAC) §3745-1-54 and pursuant to 33 CFR §332.

  • LRH-2022-162-SCR

    Expiration date: 10/27/2023

    STATE - OHIO **** APPLICANT - The Nature Conservancy **** PURPOSE - The sponsor proposes to conduct aquatic ecosystem restoration by restoring stream channels and riparian areas, re-establishing and rehabilitating wetlands, promoting effective floodplain interaction, improving water quality and aquatic resource habitat.

  • LRH-2022-899

    Expiration date: 10/21/2023

    STATE - OHIO **** APPLICANT - The Nature Conservancy **** PURPOSE - The sponsor proposes to conduct aquatic ecosystem restoration by restoring stream channels and riparian areas, re-establishing and rehabilitating wetlands, promoting effective floodplain interaction, improving water quality and aquatic resource habitat.

  • LRH-2016-490

    Expiration date: 10/15/2023

    STATE - OHIO **** APPLICANT Bavelis Zenios Development, LLC**** PURPOSE - The applicant has requested a DA authorization to discharge 3,291 cubic yards of dredged and/or fill material into one (1) forested wetland and one (1) emergent wetland in conjunction with the construction of the proposed Evans Farm Development Project

  • LRH-2023-476

    Expiration date: 10/15/2023

    STATE - OHIO **** APPLICANT - City of Lebanon **** PURPOSE - The applicant has requested a Department of the Army (DA) permit authorization for the proposed temporary discharge of dredged and/or fill material into waters of the United States in association with the Lebanon Scenic Railway Bridge Replacement Project.

  • LRH-2013-385

    Expiration date: 9/11/2023

    STATE - OHIO **** APPLICANT - CCU Coal & Construction, LLC**** PURPOSE - The applicant has requested a DA permit to discharge dredged and/or fill material into one (1) ephemeral stream, 23 intermittent streams, five (5) perennial streams, two (2) emergent wetlands, and three (3) open water features, as indicated in Table 1 and Table 2, in conjunction with the construction, operation and reclamation of the Schooley Hollow Mining Area.

  • LRH-2023-553

    Expiration date: 8/11/2023

    STATE - OHIO **** APPLICANT - Stream + Wetlands Foundation **** PURPOSE - The sponsor has submitted a proposal to develop the Laurel Run Stream In-Lieu Fee Mitigation Site to generate stream mitigation credits that may be used as compensatory mitigation for unavoidable losses to waters authorized under separate permit actions.

  • LRH-2023-551

    Expiration date: 8/11/2023

    STATE - OHIO **** APPLICANT - Stream + Wetlands Foundation **** PURPOSE - The sponsor has submitted a proposal to develop the Hellbranch Run Phase 3 Wetland Mitigation Bank to provide wetland mitigation credits that may be used as compensatory mitigation for unavoidable losses to waters authorized under separate permit.

  • LRH-2023-355

    Expiration date: 9/11/2023

    STATE - OHIO **** APPLICANT - Red Stone Farm, LLC **** PURPOSE - The sponsor has submitted a proposal to expand the existing Red Stone Mitigation Bank and provide stream and wetland mitigation credits to be used as compensatory mitigation for unavoidable losses to waters authorized under separate permit actions.

  • LRH-2015-00592; LRP-2015-798; NAO-2015-0898

    Expiration date: 7/28/2046

    STATE - WEST VIRGINIA **** APPLICANT - Mountain Valley Pipeline, LLC **** PURPOSE - Notice of Permit Authorization
  • LRH-2022-55

    Expiration date: 7/20/2023

    STATE - WEST VIRGINIA **** APPLICANT - NUCOR STEEL WEST VIRGINIA, LLC **** PURPOSE - Nucor has requested Department of the Army (DA) authorization for proposed discharges of dredged and/or fill material into direct and indirect tributaries of the Ohio River, associated wetlands, and for the work along the Ohio River.

  • LRH 2012-00959; LRB 2012-01404; LRP 2012-00572

    Expiration date: 4/24/2023

    STATE - Ohio **** APPLICANT - The Nature Conservancy **** PURPOSE - The Sponsor has submitted a request to modify their existing ILF program instrument, dated October 2, 2012, to include general revisions reflecting present day compensatory mitigation standards and concepts, the inclusion of updated watershed and project data, and to modernize aspects of their operations based on current practices as well as additional process improvements.

  • LRH-2021-600

    Expiration date: 7/17/2023

    STATE - OHIO **** APPLICANT - Terry Coyne Properties, LLC **** PURPOSE - The applicant has requested a DA authorization to permanently discharge dredged and/or fill material into approximately 6,236 linear feet of one (1) stream (AD 1) in conjunction with the Bulen Pierce Road Project, as depicted on the attached Site Plan (Sheet 1 of 2).

  • LRH-2023-354

    Expiration date: 6/5/2023

    STATE - OHIO **** APPLICANT - STREAM+WETLANDS FOUNDATION **** PURPOSE - The sponsor has submitted a mitigation site plan to the Corps, Huntington District detailing the proposed development of a wetland mitigation bank.

  • LRH-2021-912

    Expiration date: 6/6/2023

    STATE - WEST VIRGINIA **** APPLICANT - Kingston Mining, Inc. **** PURPOSE - The applicant has requested a DA permit to discharge dredged and/or fill material into 2,364 linear feet of perennial and intermittent streams and 4.31 acres of PEM, PSS, and open water wetlands in conjunction with the construction, operation and reclamation of the Sewell Deep Mine.
  • LRH-2019-943

    Expiration date: 5/5/2023

    STATE - WEST VIRGINIA **** APPLICANT - Ramaco Resources, LLC **** PURPOSE - The applicant has requested a DA permit to discharge dredged and/or fill material into a total of 7,367 linear feet of intermittent and ephemeral stream channels in conjunction with the construction, operation and reclamation of the Elk Creek Refuse Facility.

  • LRH-2012-113; LRP-2012-1750

    Expiration date: 6/5/2023

    STATE - OHIO **** APPLICANT - STREAM+WETLANDS FOUNDATION **** PURPOSE - The Sponsor has submitted a request to modify, consolidate, and revise their existing approved ILF program instruments (LRH-2013-00112-Wetlands, LRH-2014-00999-Streams, LRP-2012-1750-Wetlands, and LRP-2014-01129-Streams).

  • LRH-2022-55

    Expiration date: 5/5/2023

    STATE - WEST VIRGINIA **** APPLICANT - NUCOR STEEL WEST VIRGINIA, LLC **** PURPOSE - Since issuance of the October 5, 2022 notice, in January 2023, the applicant submitted a revised design this office. A description of the current project design has been included in Enclosure 1 of this Public Notice.

  • Notice of Availability of the Beta Streamflow Duration Assessment Methods for the Northeast and Southeast

    The U.S. Army Corps of Engineers (Corps) Baltimore, Buffalo, Charleston, Chicago, Detroit, Fort Worth, Galveston, Huntington, Jacksonville, Kansas City, Little Rock, Louisville, Memphis, Mobile, Nashville, New England, New Orleans, New York, Norfolk, Philadelphia, Pittsburgh, Savannah, St. Louis, Tulsa, Vicksburg, and Wilmington Districts, and the U.S. Environmental Protection Agency (EPA), Regions 1, 2, 3, 4, 5, 6, and 7 jointly announce the availability of the Beta Streamflow Duration Assessment Methods (SDAM) for the Northeast and Southeast (dated April 12, 2023). The methods are rapid assessment tools to help distinguish between ephemeral, intermittent, and perennial streamflow at the reach scale for the Northeast and Southeast SDAM Regions. The beta SDAMs may help provide technical guidance for identifying waters that may be subject to regulatory jurisdiction under Section 404 of the Clean Water Act; however, these methods do not alter or change the definition of “Waters of the U.S.”

  • LRH-2022-932

    Expiration date: 4/6/2023

    STATE - WEST VIRGINIA****PURPOSE - PROPOSED REGIONAL GENERAL PERMIT FOR ABANDONED MINE LANDS WITHIN THE HUNTINGTON AND PITTSBURGH DISTRICTS FOR THE STATE OF WEST VIRGINIA

  • LRH 2021-00987

    Expiration date: 3/27/2023

    STATE - Ohio **** APPLICANT - The Nature Conservancy **** Purpose - The sponsor proposes to conduct aquatic ecosystem restoration by stabilizing and restoring stream channel, re-establishing wetlands, promoting effective floodplain interaction, and improving the overall habitat and water quality of the site.

  • LRH-2022-621

    Expiration date: 3/30/2023

    STATE - WEST VIRGINIA **** APPLICANT - GREENBRIER MINERALS, LLC **** PURPOSE - The applicant has requested a permit to discharge dredged and/or fill material into perennial, intermittent, and ephemeral stream channels, and an open water impoundment in conjunction with the construction, operation and reclamation of the Elklick Contour Surface Mine

  • LRH-2015-00592-GBR; LRP-2015-798; NAO-2015-0898

    Expiration date: 2/25/2023

    NOTICE OF COMMENT PERIOD EXTENSION **** STATE - West Virginia **** APPLICANT - Mountain Valley Pipeline, LLC ****The public comment period on this proposal has been extended until February 25, 2022. The information provided in the December 12, 2022 Public Notice remains valid.
  • LRH-2022-00097

    Expiration date: 2/25/2023

    STATE - OHIO **** APPLICANT - THE NATURE CONSERVANCY **** PURPOSE - The sponsor has submitted a proposal to develop the Long Branch Farm ILF Mitigation Project to deliver compensatory mitigation to offset stream and wetland impacts within the Lower Miami watershed.

  • LRH 2022-869

    Expiration date: 2/11/2023

    STATE - OHIO **** APPLICANT - Ohio Department of Natural Resources (ODNR) **** PURPOSE - The applicant has requested authorization for the permanent discharge of dredged and/or fill material into waters of the United States associated with the decommissioning of the Churn Creek Dam within the Shawnee State Forest.

  • LRH 2015-00592-GBR; LRP 2015-798; NAO 2015-0898

    Expiration date: 2/10/2023

    STATE - Pittsburgh, West Virginia and Virginia **** APPLICANT - Mountain Valley Pipeline, LLC **** PURPOSE - The applicant has provided supplemental information which overall reduces impacts. This includes a detailed stream and wetland restoration plan, a voluntary proposal to provide additional compensatory mitigation for longer-term temporary impacts to waters of the U.S., a cumulative effects assessment, minor corrections, and refinements to the amount of discharges of dredged and/or fill material into waters of the U.S. necessitated by the proposed project to further avoid and minimize effects to waters of the U.S.
  • LRH 2015-00592-GBR; LRP 2015-798; NAO 2015-0898

    Expiration date: 1/11/2023

    TO WHOM IT MAY CONCERN: On March 29, 2021, the United States (U.S.) Army Corps of Engineers (Corps) Huntington, Pittsburgh, and Norfolk Districts (collectively the Districts) issued joint Public Notices LRH-2015-00592-GBR, LRP-2015-798, and NAO-2015-0898 announcing the application for a Department of the Army (DA) Permit under the provisions of Section 10 of the Rivers and Harbors Act of 1899 (Section 10) and Section 404 of the Clean Water Act (Section 404) for the proposed discharge of dredged and/or fill material into waters of the U.S. and work in and under navigable waters of the U.S. This Public Notice can be found at the following link: https://www.lrh.usace.army.mil/Missions/Regulatory/Public-Notices/Article/2553962/lrh-2015-592-gbr/ Subsequently, on September 30, 2021 the Corps issued a Public Notice announcing virtual public hearings, which were held on November 1, 2021 and November 4, 2021, and the opening of a written comment period which closed on November 19, 2021. As part of the Corps’ permit evaluation process, the applicant has provided supplemental information, as discussed below, and is soliciting comments from the public, federal, state and local agencies and officials, Indian Tribes and other interested parties in order to consider and evaluate the supplemental information provided by the applicant.
  • LRH 2022-510

    Expiration date: 12/29/2022

    STATE - Ohio *** APPLICANT - NorthPoint Development LLC *** PURPOSE - The applicant has requested authorization to permanently discharge dredged and/or fill material into approximately 8.5 acres of one (1) wetlandin association with the construction of the proposed Morris Farm Site – Warehousing and Logistics Development.

  • LRH 2022-00823

    Expiration date: 11/14/2021

    TO WHOM IT MAY CONCERN: The district engineer has received a mitigation site plan proposing the establishment of a mitigation bank to provide compensatory mitigation for Federal and State permits as described in this Public Notice. This Public Notice is required pursuant to the “Compensatory Mitigation for Losses of Aquatic Resources; Final Rule,” (Rule) as published in the April 10, 2008, Federal Register, Vol. 73, No. 70, Pages 19594-19705 (33 Code of Federal Regulations [CFR] Parts 332). The purpose of this Public Notice is to inform you of the proposed ecological restoration work and to solicit your comments and information to better enable us to make a reasonable decision on factors affecting the public interest.
  • LRH 2008-00850

    Expiration date: 11/5/2021

    TO WHOM IT MAY CONCERN: The following application has been submitted for a Department of the Army (DA) Permit under the provisions of Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act of 1899 (Section 10).
  • LRH 2015-00592-GBR; LRP 2015-798; NAO 2015-0898

    Expiration date: 1/11/2023

    STATE - Pittsburgh, West Virginia and Virginia **** APPLICANT - Mountain Valley Pipeline, LLC **** PURPOSE - The applicant has provided supplemental information which overall reduces impacts. This includes a detailed stream and wetland restoration plan, a voluntary proposal to provide additional compensatory mitigation for longer-term temporary impacts to waters of the U.S., a cumulative effects assessment, minor corrections, and refinements to the amount of discharges of dredged and/or fill material into waters of the U.S. necessitated by the proposed project to further avoid and minimize effects to waters of the U.S.
  • LRH 2022-950

    Expiration date: 1/12/2023

    STATE - Ohio **** APPLICANT - MBJ Holdings, LLC **** PURPOSE - The applicant has requested authorization to discharge 10,605 cubic yards of dredged and/or fill material into 6.51 acres of five (5) forested wetlands and 563 linear feet (0.063 acre) of one (1) intermittent stream (Duncan Run) in conjunction with the construction of the proposed New Albany Tech Park Project.

  • LRH 2022-510

    Expiration date: 12/29/2021

    STATE - Ohio *** APPLICANT - NorthPoint Development LLC *** PURPOSE - The applicant has requested authorization to permanently discharge dredged and/or fill material into approximately 8.5 acres of one (1) wetlandin association with the construction of the proposed Morris Farm Site – Warehousing and Logistics Development.

  • LRH 2022-314

    Expiration date: 12/29/2021

    STATE - Ohio *** APPLICATION - Nestle Purina PetCare Company *** PURPOSE - The applicant has requested authorization to permanently discharge approximately 12,849 cubic yards of dredged and/or fill material into approximately 4,423 linear feet (0.55 acre) of streams, 5.29 acres of wetlands, and 0.45 acre of open water in order to construct a new wet pet food manufacturing facility.

  • LRH 2022-912

    Expiration date: 12/29/2022

    STATE - Ohio *** APPLICANT - Simpson Strong-Tie Company *** PURPOSE - The applicant has requested authorization to permanently discharge dredged and/or fill material into approximately 2.75 acres of two (2) wetlands in conjunction with the Simpson Strong-Tie Expansion Project, as depicted in the attached Preferred Alternative Wetland Exhibit.

  • LRH 2022-689

    Expiration date: 12/17/2021

    STATE - OHIO **** APPLICANT - SOUTHWEST LICKING COMMUNITY WATER & SEWER DISTRICT **** PURPOSE - The applicant authorization to discharge dredged and/or fill material into 4.65 acres of one (1) forested wetland and 12 linear feet (0.002 acre) of one (1) perennial stream (Sycamore Creek) in conjunction with the construction of the proposed Wagram Wastewater Treatment Plant Project.

  • LRH 2015-1094

    Expiration date: 12/9/2021

    STATE - Ohio *** APPLICANT - CCU Coal & Construction, LLC *** Purpose - The applicant proposes to discharge approximately 13,150 cubic yards of dredged and/or fill material into 1,274 linear feet of ephemeral streams, 5,387 linear feet of intermittent streams, and 7.96 acres of emergent wetlands associated with the construction, operation, and reclamation of the 302.3 acre Hunt Adjacent 4 Mining Area (D-2226-4).nited States (U.S.).

  • LRH 2022-00824

    Expiration date: 11/14/2021

    STATE -- OHIO **** APPLICANT -- WATER & LAND SOLUTIONS **** PURPOSE -- The sponsor has submitted a proposal to develop the Granary Mitigation Bank to provide stream mitigation credits within the Upper Scioto watershed.