2017 Notice To Navigation Interests

NTN 17-01 WINTER NAVIGATION ON THE OHIO RIVER AND TRIBUTARIES
NTN 17-02 REVIEW OF REGULATIONS AND GENERAL SAFETY PRACTICES
NTN 17-03 NOTIFICATION OF SINKING OR SUNKEN VESSELS, VESSEL GROUNDINGS, AND BARGE BREAKAWAYS
NTN 17-04 CREW CHANGE AND MAIL DELIVERY POLICIES FOR LRH DISTRICT AT NAVIGATION LOCKS FOR TOWBOAT   PERSONNEL
NTN 17-05 RESTRICTED AREAS AT NAVIGATION STRUCTURES IN THE HUNTINGTON DISTRICT
NTN 17-06 REVISION TO NOTICE TO NAVIGATION 16-32 AERIAL CROSSING REDUCED CLEARANCE KANAWHA RIVER MP 54.9
NTN 17-07 TEMPORARY CURRENT CONDITIONS GREENUP LOCKS AND DAM OHIO RIVER MILE 341.0
NTN 17-08 LOCKWALL LADDER REPLACEMENT LONDON LOCKS AND DAM KANAWHA RIVER, MILE 82.8
NTN 17-09 EMERGENCY GATE INSPECTION MELDAHL LOCKS AND DAM OHIO RIVER MILE 436.2
NTN 17-10 REVISION TO NTN 17-08 LONDON LOCKS AND DAM KANAWHA RIVER, MILE823.8
NTN 17-11 ROCK DRILLING AND SOIL SAMPLING OHIO RIVER, MILE 238.4
NTN 17-12 LOCK WALL ARMOR REPLACEMENT (MAIN CHAMBER CLOSURE) GREENUP L&D OHIO RIVER, MILE 341.0
NTN 17-13 REVISION TO NTN 17-11 ROCK DRILLING AND SOIL SAMPLING OHIO RIVER, MILE 238.4
NTN 17-14 LOCK CLOSURE CAPTAIN ANTHONY MELDAHL LOCKS AND DAM OHIO RIVER MILE 436.2
NTN 17-15 BOAT DOCK INSTALLATION KANAWHA RIVER, MILE 61.8
NTN 17-16 LOCK CLOSURE BELLEVILLE LOCKS AND DAM OHIO RIVER MILE 203.9
NTN 17-17 SHOALING CONDITIONS ROBERT C. BYRD LOCKS AND DAM OHIO RIVER, MILE 279.2
NTN 17-18 DIVING OPERATIONS FOR RETAINING 
NTN 17-19 REVISION TO NTN 17-17 SHOALING CONDITIONS RC BYRD LOCKS AND DAM OHIO RIVER, MILE 279.2
NTN 17-20 SHOALING CONDITIONS WINFIELD LOCKS AND DAM KANAWHA RIVER, MILE 31.1
NTN 17-21 NOTICE TO NAVIGATION INTERESTS 17-21 CORE BORINGS KANAWHA RIVER MILE 42.0
NTN 17-22 BOAT DOCK INSTALLATION KANAWHA RIVER, MILE 60.6
NTN 17-23 REVISION TO NTN 17-20, SHOALING CONDITIONS WINFIELD LOCKS AND DAM KANAWHA RIVER, MILE 31.1
NTN 17-24  CHANNEL MAINTENANCE DREDGING TENTATIVE SCHEDULE HUNTINGTON DISTRICT OHIO RIVER
NTN 17-25 MOORING CELL REPAIR, DOLPHIN INSTALLATION, AND MISCELLANEOUS BANK WORK BIG SANDY MILE 3.8
NTN 17-26 BOAT DOCK INSTALLATION KANAWHA RIVER, MILE 37.8
NTN 17-28 CHANNEL MAINTENANCE DREDGING TENTATIVE SCHEDULE HUNTINGTON DISTRICT OHIO RIVER
NTN 17-29 BRIDGE INSPECTION PATRICK STREET BRIDGE KANAWHA RIVER MILE 56.4
NTN 17-30 BANK STABILIZATION KANAWHA RIVER, MILE 36.6
NTN 17-31 REVISION TO NTN 17-14 LOCK CLOSURE CAPTAIN ANTHONY MELDAHL L&D OHIO RIVER MILE 436.2
NTN 17-32 BOAT DOCK INSTALLATION KANAWHA RIVER, MILE 61.8
NTN 17-33 CHANNEL MAINTENANCE DREDGING BIG SANDY RIVER, MILES 0.0 TO 9.0
NTN 17-34 REVISION TO NTN 17-14 LOCK CLOSURE CAPTAIN ANTHONY MELDAHL L&D OHIO RIVER MILE 436.2
NTN 17-35 REVISION TO NTN 17-16 LOCK CLOSURE BELLEVILLE LOCKS AND DAM OHIO RIVER MILE 203.9
NTN 17-36 DIVING OPERATIONS MUSSEL SURVEY AND RELOCATION KANAWHA RIVER, MILE 73.3 TO 73.5
NTN 17-37 BANK STABILIZATION KANAWHA RIVER MILE 43.7
NTN 17-38 CORE DRILLING KANAWHA RIVER MILE 42.0
NTN 17-39 REVISION TO NTN 17-34 LOCK CLOSURE MELDAHL LOCKS AND DAM OHIO RIVER MILE 436.2
NTN 17-40 FACILITY MAINTENANCE DREDGING OHIO RIVER MILES 401 THROUGH 406
NTN 17-41  REVISION TO NTN 17-25 MISCELLANEOUS MOORING STRUCTURE AND BANK WORK BIG SANDY MILE 3.8
NTN 17-42 TOTAL RIVER CLOSURE BELLEVILLE LOCKS AND DAM OHIO RIVER MILE 203.9
NTN 17-43 REVISION TO NTN 17-25 MISCELLANEOUS MOORING STRUCTURE AND BANK WORK BIG SANDY RIVER MILE 3.8
NTN 17-44  REVISION TO NTNI 17-42 TOTAL RIVER CLOSURE BELLEVILLE LOCKS AND DAM OHIO RIVER MILE 203.9
NTN 17-45  REVISION TO NTNI 17-42 TOTAL RIVER CLOSURE BELLEVILLE LOCKS AND DAM OHIO RIVER MILE 203.9
NTN 17-46 REVISION TO NTN 17-16 LOCK CLSURE BELLEVILLE LOCKS AND DAM OHIO RIVER MILE 203.9